Open cabinet in a data-hall aisle.

Hong Kong data halls

HKIDCE

IDC field engineering in Hong Kong

When a Hong Kong data hall needs people on the floor, we rack, cable, patch, test, and hand the records back.

The hall stays in service while one cabinet is open.

What you are hiring

  • Engineers who enter with the hall’s access-application reference.
  • Work in the cabinet and on the hall routes: mount, dress, patch, pigtail, and test.
  • A pack at the end: photos, the U list, material counts, test rounds, and the checkout.

Four kinds of work

A job can include more than one.

Mounting equipment to a cabinet U position.

Rack and stack

The cabinet is mounted, labelled, and dressed, and the U position is confirmed.

Read this work
Patch cords and fiber pigtails in a cabinet.

Cabling, patch cords, and fiber pigtails

Both ends match, and the pieces and metres are on one list.

Read this work
Near-end light check on a fiber port.

Pigtail tests and cabinet light checks

Each round says lit, unlit, or not tested.

Read this work
Work in a live data hall.

Emergency on-site support

The first reply says whether a crew can make that window.

Read this work

An example you can rewrite. Not a client project.

A sample scope

01One cabinet.
02Eight servers to mount.
03Twenty-four duplex patch cords.
04Single-core and dual-core pigtails, counted in pieces and metres.
05One round of near-end and far-end light checks.
06Checkout the same day.

The dressed-cabinet photo. The U list. The material list. The round sheet. The checkout note: what was finished, and what is still open.

What comes back

  • Cabinet photo and U list
  • Material list: item, pieces, metres
  • Test rounds: lit, unlit, or not tested
  • Checkout: finished items and open items
  • Access-application reference carried on the day
  • Project files for that job

Write from anywhere

Tell us the hall, the task, and the window. A district is enough if the hall name cannot be shared yet.

Go to the form